| Anodizing – Process Operator |
| Anodizing – Process Owner |
| Anodizing – Process Planner |
| AS/ EN/ JISQ 9100 Rev C |
| Contract Review |
| Fusion Welding (GTAW) – Process Owner |
| Fusion Welding (GTAW) – Process Planner |
| Heat Treating – Process Owner |
| Heat Treating – Process Planner |
| Internal Auditing |
| Introduction to Aerospace Quality |
| Advanced Pyrometry *new* |
| Pyrometry II: Aerospace Pyrometry AMS2750 |
| Nadcap Audit Preparation – Chemical Processing |
| Chemical Processing: Nadcap Audit Criteria Review |
| Nadcap Audit Preparation – Coatings |
| Nadcap Checklist Review – Coatings |
| Nadcap Checklist Review – Electronics *new* |
| Nadcap Audit Preparation – Heat Treating |
| Heat Treating: Nadcap Audit Criteria Review |
| Nadcap Audit Preparation – NDT |
| Nadcap Checklist Review – NDT |
| Nadcap Audit Preparation – Welding |
| Nadcap Checklist Review – Welding |
| NDT Level III Responsibilities |
| Process Failure Mode and Effect Analysis |
| Problem Solving Tools |
| Root Cause Corrective Action (RCCA) |
| Statistical Process Control |